IRB Infrastructure Developers

L65910MH1998PLC115967 · ISIN — · 2 filings, FY 2022-23 to FY 2023-24 · consolidated basis

Reclaimed at end of life

Tonnes as filed. Totals combine re-used, recycled and safely disposed, because filers place comparable activity in different columns.

CategoryFY 2022-23FY 2023-24
Plastics including packaging not filednot filed
E-waste not filednot filed
Hazardous waste not filednot filed
Other waste 3,488.43not filed
Total reclaimed 3,488.430

Recycled or reused input material

Share of total material by value, per material line as the company named it. Each line carries its own denominator, so they are never summed or averaged.

Input material, as filedFY 2022-23FY 2023-24
Pond-ash substitute of soil 91.0%69.4%
M-sand substitute of natural sand 59.6%71.3%
Iron Slag Boulder substitute of aggregate 7.0%27.7%
Cement substitution by Ground granulated blast furnace slag (GGBS) 1.4%24.7%
In FY 22, the Company has undertaken a pilot project where 16% of cement was substituted by fly-ash at one of its project site. 0.0%not filed

NIC codes filed

Products and services accounting for 90 percent of turnover, latest filing.

CodeDescription as filedShare of turnover
42101 Construction and Maintenance of Roads and Toll Operations* 100.00%

Source filings

YearBasisTaxonomyTurnover as filed
FY 2022-23 Consolidated 2023-06-30 67,03,31,40,000
FY 2023-24 Consolidated 2024-04-30 82,01,76,10,000

Figures read from BRSR XBRL as filed. Nothing estimated or restated. How this works · Report an error